== Tool Change == | |||
*Jog Z-axis up | |||
*Press E-Stop | |||
*Remove collet nut, collet, cutter from spindle | |||
*Select appropriate new cutter | |||
**Select appropriate collet to match cutter shank diameter | |||
***Ref: [[CNC_Router_Collets]] | |||
*Install collet in collet nut | |||
*Loosely install collet nut/collet in spindle | |||
*Insert new cutter leaving enough stickout clearance for thickness of work material | |||
*Tighten using 2 wrenches in CNC tools bin | |||
**Excessive tightening is not needed | |||
*Release E-stop | |||
*Press "RESET" in Mach3 | |||
*Jog machine down in Z to touch off cutter to either "Material surface" or "Machine bed" as user defined in VCarve | |||
**May need to jog in X & Y first | |||
*Press "Zero Z" '''NOT X OR Y''' | |||
*Jog up in Z above material | |||
[[Category:CNC Router]] | [[Category:CNC Router]] |
Revision as of 17:23, 4 March 2020
Power UP Procedure
- Power up CNC computer
- Ensure Mach3 is running
- Plug in main power cord for machine
- Release E-stop
- Press 'RESET' in Mach3
- Press 'Ref All Home'
- Machine will move up in Z, left in X, towards in Y, in that order
- Press E-Stop
- Install collet, collet nut, and cutter
- Release E-Stop
- Jog machine in X & Y to starting position
- Press "Zero X"
- Press "Zero Y"
- Jog machine down in Z to touch off cutter to either "Material surface" or "Machine bed" as user defined in VCarve
- Press "Zero Z"
- Load G-Code into Mach3
- Turn on dust collector
- Press "Cycle Start"
Power DOWN Procedure
- Remove material from bed surface
- Pull out any nails/screws left behind
- Vacuum up all remaining dust
- Press E-Stop
- Remove collet nut and cutter from spindle
- Place in CNC tools bin
- Return bin to drawer under computer
- Place in CNC tools bin
- Unplug main power cord
- Close Mach3
- Shutdown/Power-off computer
Tool Change
- Jog Z-axis up
- Press E-Stop
- Remove collet nut, collet, cutter from spindle
- Select appropriate new cutter
- Select appropriate collet to match cutter shank diameter
- Ref: CNC_Router_Collets
- Select appropriate collet to match cutter shank diameter
- Install collet in collet nut
- Loosely install collet nut/collet in spindle
- Insert new cutter leaving enough stickout clearance for thickness of work material
- Tighten using 2 wrenches in CNC tools bin
- Excessive tightening is not needed
- Release E-stop
- Press "RESET" in Mach3
- Jog machine down in Z to touch off cutter to either "Material surface" or "Machine bed" as user defined in VCarve
- May need to jog in X & Y first
- Press "Zero Z" NOT X OR Y
- Jog up in Z above material